I’m not talking about the incident in Romania, but in Germany.
A shipyard needed some wires over a river deactivated and that caused an overload cascade, because the river was the border between two providers who had different assumptions about the capacity of the power lines connecting them.
I’m not talking about the incident in Romania, but in Germany.
A shipyard needed some wires over a river deactivated and that caused an overload cascade, because the river was the border between two providers who had different assumptions about the capacity of the power lines connecting them.
oh damn, ain’t something. I will be looking into that, thank you!